General Description
Equipped together with the zero leak bidirectional checking sole-noid valves, this power unit is designed for that operation of two independent circuits. Which are respectively for the principal and subordinate platforms of the double scissors lift. Two cut-off valves are made use of for decreasing the machine manually in case of power loss. If additional independent circuits are demanded for the application please get hold of us for availability.
Remark: one. Please check with our sales engineer for the distinctive pump displacement, motor electrical power or tank capacity.
2. CSA or UL licensed motors can be found upon request.
Specific Notes
one. The AC motor is of S3 duty cycle, which might only get the job done intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean each of the hydraulic elements concerned ahead of set up of the electrical power unit.
3. Viscosity on the oil shoud be 15~46 cst,and the oil must be clean and absolutely free of impurities,N46 hydraulic oil is encouraged.
4. The power unit ought to be mounted vertically.
5. Check the oil level within the tank after the original running on the electrical power unit.
six. Oil changing is required following the initial one hundred operation hrs,afterwards after each and every 3000 hours.